Test #2 - Test check valve #2 for a minimum of 1.0 psi in the direction of flow .
- CLOSE TESTCOCK 2 AND TESTCOCK 3
- MOVE SHORT TUBE FROM TESTCOCK 3 TO TESTCOCK 4
- REMOVE HIGH HOSE FROM TESTCOCK 2
- OPEN INLET SHUTOFF VALVE
- ATTACH HIGH HOSE TO TESTCOCK 3
- OPEN TESTCOCK 4 TO FILL TUBE
- CLOSE TESTCOCK 4
- OPEN TESTCOCK 3 SLOWLY
- OPEN HIGH BLEED - BLEED AIR FROM GAUGE
- CLOSE HIGH BLEED
- CLOSE INLET SHUTOFF VALVE
- OPEN TESTCOCK 4 (TESTCOCK 3 MUST BE OPEN)
Note: GAUGE MUST READ 1.0 psi OR GREATER TO PASS
- RECORD VALUE OF CV 2
|
|
 |
Outlet Shut-off Valve leaks - Customer is using water.
- If the customer is using water and the outlet shut-off valve is leaking, lower the gauge and end of the low pressure hose to center of the assembly.
- RECORD VALUE OF CV 2
|
|
 |
Final Steps
- CLOSE TESTCOCKS - REMOVE ALL EQUIPMENT
- OPEN ALL NEEDLE VALVES ON TEST KIT
- OPEN INLET SHUTOFF VALVE
- OPEN OUTLET SHUTOFF VALVE SLOWLY
|
|
|