SVB Field Test
Preparation
- NOTIFY CUSTOMER
- INSPECT AREA
- REMOVE CANOPY
- FLUSH TESTCOCK and BLEED SCREW (VENT VALVE)
- INSTALL FITTINGS
- INSPECT TEST KIT - CLOSE ALL NEEDLE VALVES
|
|
|
Test #1 - Test check valve for a minimum of 1.0 psi in the direction of flow.
- INSTALL TEST GAUGE AND END OF LOW HOSE LEVEL WITH BLEED SCREW
- ATTACH COMPENSATING (BLEED-OFF) TEE TO THE TESTCOCK
- ATTACH HIGH HOSE TO BLEED-OFF TEE
- OPEN TESTCOCK SLOWLY
- OPEN HIGH BLEED - BLEED AIR FROM GAUGE
- CLOSE HIGH BLEED
- CLOSE OUTLET SHUTOFF VALVE
- CLOSE INLET SHUTOFF VALVE
- OPEN BLEED SCREW TO LOWER PRESSURE IN BODY
- WHEN WATER STOPS RUNNING FROM BLEED VALVE
RECORD CHECK VALVE > or = 1.0 PSI
|
|
 |
Test #2 - Test air inlet valve for a minimum of 1.0 psi.
- MAINTAIN TEST GAUGE AND END OF LOW HOSE LEVEL WITH BLEED SCREW
- OPEN HIGH BLEED 1/4 turn max.
- RECORD WHEN AIR INLET OPENS > or = 1.0 PSI
|
|
 |
Final Steps
- CLOSE TESTCOCK AND BLEED SCREW -
- REMOVE ALL EQUIPMENT
- OPEN ALL NEEDLE VALVES ON TEST KIT
- REPLACE THE CANOPY
- OPEN INLET SHUTOFF VALVE
- OPEN OUTLET SHUTOFF VALVE SLOWLY
|
|
|